Pusher — Hardened native RollingUpdate (operator and developer operations)

This document is the operational contract for the hardened native Kubernetes RollingUpdate of the pusher GKE workload. It is deliberately not a design essay: it states what operators and developers can rely on, the exact termination sequence the chart produces, the preflight gates that must pass before a rollout is allowed, and the N/N-1 compatibility rules.

Scope and ownership:

  • The chart values are the single source of truth for rollout inputs (backend/charts/pusher/{dev,prod}_omi_pusher_values.yaml). When the live cluster disagrees with the chart, the chart wins and the gap is a deploy problem to close, never a reason to weaken the chart.
  • This hardening is native RollingUpdate only. No Argo Rollouts, Flagger, service mesh, Gateway API, or two-color experiment is in scope.
  • Production adoption is a LATER, explicit decision. This PR lands the hardening and the operational contract on top of the existing pusher baseline. It is qualified dev-first (see Dev qualification plan). Do not read this document as "pusher is production-ready for the new rollout" until SCA-40 lands and a healthy prod pusher baseline is confirmed.

Related runbook: backend/docs/runbooks/pusher-degraded.md covers sustained degraded-session ratio. This document covers the rollout itself.


Honest availability contract

State this plainly, because it governs every operator decision below: no approach preserves in-flight WebSocket sessions across a pusher cutover over the proxied ALB + NEG path. Pusher holds long-lived binary WebSocket sessions from backend-listen. When a pod's endpoint leaves the NEG, the load balancer cuts the existing connections on it.

What "graceful drain" actually means here:

  • Zero new-connection rejection during a healthy rollout. The readiness gate flips a draining pod to 503 so the LB stops routing new sessions to it while other pods are still serving. New backend-listen connects go to healthy pods.
  • A bounded reconnect gap per affected session, roughly 1-60 seconds. backend-listen owns the reconnect: when its pusher socket is cut it reconnects to a healthy pod. The gap is the time between the cut and the next successful reconnect, not a migration.
  • The LB cut is bounded by BackendConfig connectionDraining. It sets how long the load balancer waits before hard-cutting in-flight connections on an endpoint that has left the NEG — here drainingTimeoutSec: 60. Without it the default is a hard cut on endpoint removal.
  • Background finalization is bounded by the pod grace period. In-flight work (audio batched to GCS, transcripts routed to integrations, LLM analysis, speaker-sample extraction) is drained by the app within terminationGracePeriodSeconds; anything still running at the deadline is SIGKILLed. Durable finalization is reconciled by the conversation-finalization job lane, so a SIGKILLed session does not strand a conversation in processing.

Do not claim sub-second or zero-session-impact cutover. The contract is: new connections keep flowing, existing sessions take a bounded reconnect gap, and background work finishes or is durably reconciled.


What changed in the hardening

The chart previously sent liveness, readiness, and startup probes all to /health, had no app-level drain (preStop was only sleep 15), and the BackendConfig had no connectionDraining (so the LB hard-cut in-flight WebSocket on endpoint removal). The hardening splits serving readiness from liveness and adds an app-level drain:

Concern Before After (hardened)
Readiness signal readinessProbe -> /health readinessProbe -> /ready (200 serving / 503 draining)
Liveness / startup /health unchanged, still /health
LB health check BackendConfig healthCheck.requestPath: /health unchanged, still /health
New-connection drain none; preStop = sleep 15 preStop: curl -sf -m 5 -X POST http://localhost:8080/__internal/drain || true; sleep 15 — POST flips /ready to 503 (loopback), || true never blocks termination, sleep 15 covers NEG convergence
LB in-flight cut none; connectionDraining absent (hard cut on endpoint removal) BackendConfig connectionDraining.drainingTimeoutSec: 60 bounds the LB wait (60 <= grace 120)

Endpoints introduced by this hardening (on the pusher process, port 8080):

  • GET /ready -> 200 while serving, 503 once the process is draining.
  • POST /__internal/drain -> loopback only. Triggers the drain: flips /ready to 503 and lets background finalization run down within the grace period. preStop is the only intended caller.

Rollout inputs that are already correct in the chart and are reused, not rebuilt (verified against {dev,prod}_omi_pusher_values.yaml):

  • progressDeadlineSeconds: 9600 in both charts. CI derives the healthy rollout budget from the chart (backend/scripts/verify_pusher_rollout_budget.py); prod at its 40-pod HPA ceiling is fourteen waves of ~640s availability = an 8960s healthy budget, with 9600s as the committed deadline. The observed live value of 600 on an existing release is a deploy drift gap, not a chart gap — the chart value stays at 9600 and a real deploy must reconcile the cluster to it.
  • prod strategy: RollingUpdate { maxUnavailable: 1, maxSurge: 2 } (dev is { maxUnavailable: 0, maxSurge: 1 }).
  • terminationGracePeriodSeconds: 120 in both charts.
  • prod autoscaling minReplicas: 12, maxReplicas: 40, activeConnectionsPerPod: 30; dev minReplicas: 1, maxReplicas: 3.
  • podDisruptionBudget.minAvailable: 80% in both charts.

Dedicated development Pusher capacity

Development Pusher alone tolerates dedicated=pusher:NoSchedule. Its existing required node affinity still requires matching service=pusher and env=dev labels, so that toleration does not admit LLM Gateway, Agent Proxy, or other workloads to the pool. Production deliberately retains no corresponding toleration; it is a separate configuration boundary.

Before a dev Pusher rollout, an external approved GKE operation must provide two Ready, schedulable Pusher-capable nodes matching that affinity, each tainted dedicated=pusher:NoSchedule. Two matching nodes leave room for the single serving pod and its maxSurge: 1 replacement during a rolling update. Helm only renders the workload toleration: it does not create, label, taint, or scale GKE node capacity. Dev HPA remains minReplicas: 1, maxReplicas: 3, and its rolling-update settings remain maxSurge: 1, maxUnavailable: 0.

Fail-closed rollout gates (preflight scripts that must pass before a deploy) are listed in Operator runbook and the blocking signals in Rollout quality gates (fail-closed).


Termination sequence

For a single pod being replaced during a RollingUpdate, the chart produces this sequence (accurate to templates/deployment.yaml and the values files):

  1. Pod enters Terminating. Kubernetes starts the pod's terminationGracePeriodSeconds: 120 clock.
  2. preStop hook runs in parallel with endpoint removal. It runs curl -sf -m 5 -X POST http://localhost:8080/__internal/drain || true; sleep 15 — the POST (loopback) flips /ready to 503, || true guarantees the hook never blocks termination if the drain call fails, and sleep 15 gives the NEG time to converge before SIGTERM.
  3. Readiness starts failing; the endpoint leaves the NEG. The readiness probe is failureThreshold: 3 x periodSeconds: 10, so a draining pod is removed from the Service/NEG endpoints roughly 30 seconds after /ready goes 503. From this point the LB sends no new connections to the pod.
  4. SIGTERM is delivered (after preStop completes; the sleep 15 bounds how long that takes). The pusher lifespan shutdown drains process-level background tasks (drain_background_tasks) and closes async HTTP client pools.
  5. Background finalization drains within the grace period. Each active WebSocket session drains its background task queue (bounded by BG_DRAIN_TIMEOUT in the WS handler); audio/transcript/analysis work that can finish inside the remaining grace does so.
  6. SIGKILL at 120s. Anything still running at the grace deadline is killed. A SIGKILLed session does not strand a conversation: durable finalization is reconciled by the conversation-finalization job lane.

Key timing knobs and what they bound:

  • preStop sleep 15 — NEG convergence window before SIGTERM.
  • readiness failureThreshold * periodSeconds (~30s) — how long after /ready flips 503 before the endpoint is actually removed from the NEG.
  • BackendConfig connectionDraining.drainingTimeoutSec: 60 — how long the LB waits before hard-cutting the in-flight connections on the removed endpoint (deliberately <= the 120s pod grace).
  • terminationGracePeriodSeconds: 120 — the hard ceiling on background finalization before SIGKILL.

Operator runbook

Small, hard-to-misuse steps. Run from the repository root of a checkout that matches the image you intend to deploy.

1. Render the chart and confirm inputs

Render dev and prod and eyeball the values that drive availability:

helm template pusher backend/charts/pusher \
  -f backend/charts/pusher/dev_omi_pusher_values.yaml \
  --set-string image.digest=sha256:<64-lowercase-hex> \
  --set-string image.tag= \
  --set-string image.pullPolicy=IfNotPresent > /tmp/pusher-dev.yaml

helm template pusher backend/charts/pusher \
  -f backend/charts/pusher/prod_omi_pusher_values.yaml \
  --set-string image.digest=sha256:<64-lowercase-hex> \
  --set-string image.tag= \
  --set-string image.pullPolicy=IfNotPresent > /tmp/pusher-prod.yaml

Confirm in the rendered output: readinessProbe.httpGet.path: /ready, livenessProbe/startupProbe on /health, the BackendConfig healthCheck on /health plus connectionDraining, preStop calling /__internal/drain, and progressDeadlineSeconds: 9600. Confirm the dev Deployment has the dedicated=pusher:NoSchedule toleration and the prod Deployment does not.

2. Run the fail-closed preflight

The chart budget and the rollout gate must both pass. Both are dependency-free static/contract checks (stdlib only, no cluster or registry reads):

# Derives the healthy rollout budget from the chart (waves x availability) and
# fails if progressDeadlineSeconds or the workflow rollout timeout undercut it.
python3 backend/scripts/verify_pusher_rollout_budget.py

# Static + contract preflight: capacity headroom, image/config identity, probe
# split, and that the rollout-blocking metrics are DEFINED in utils/metrics.py.
python3 backend/scripts/verify_pusher_rollout_gate.py preflight

verify_pusher_rollout_budget.py recomputes prod as fourteen waves x ~640s and fails if progressDeadlineSeconds drops below the budget or a workflow's kubectl rollout status ... --timeout= is too short.

verify_pusher_rollout_gate.py preflight (the default subcommand) fails closed (non-zero exit) on any open gate. It checks, statically: capacity headroom (podDisruptionBudget.minAvailable, HPA minReplicas, maxSurge/ maxUnavailable, and terminationGracePeriodSeconds >= the connectionDraining timeout); image and config identity; the probe split (readinessProbe -> /ready, liveness/startup -> /health, connectionDraining present); and that the rollout-blocking metrics are defined in utils/metrics.py — a missing metric definition is a failure, because a rollout cannot be judged healthy against telemetry that does not exist. It does not scrape live values; use ... rollback --env <env> for the rollback-mode contract check. Do not weaken the chart to make a check pass; fix the input.

3. Live production gate and development-qualified digest promotion

The automatic development Pusher workflow builds once, resolves the pushed sha256 digest, runs the ConfigMap reference and live capacity gates, waits for the rollout, and only then uploads pusher-dev-qualification. Production remains manual: it requires that digest plus the successful development run ID. The production workflow downloads the attestation, verifies its exact GitHub run and main source SHA, rejects Pusher source/chart drift since that bake, copies the same digest into the production registry, and deploys repository@sha256:.... It never rebuilds a production Pusher image.

Immediately before Helm, verify_pusher_live_deployment_gate.py renders that exact digest and reads only Kubernetes metadata. It fails closed unless the next maxSurge wave fits on a Ready, schedulable node matching Pusher's affinity and tolerations. This is capacity evidence, not a claim that the rollout has product traffic or user-success proof.

The dev Pusher dashboard is backed by the isolated dev Prometheus scrape. It shows existing connection, readiness/drain, reconnect/recovery and backend-listen circuit-breaker aggregates, plus target health, without creating traffic. Pod health alone is not product-success evidence.

Read-only development evidence boundary

The development Prometheus jobs discover only dev-omi-backend pods carrying the env=dev workload label. They retain the existing bearer-token file reference; do not fetch /metrics directly, inspect the token, copy headers, or weaken authentication. The dashboard contains only low-cardinality aggregates and target labels (job, namespace, and pod), never connection IDs, user data, or request payloads.

For a passive development-bake check in the permitted read-only operator plane, use the Pusher dashboard or these equivalent PromQL expressions:

  • active Pusher WebSockets: sum(pusher_active_ws_connections{job="pusher-metrics"})
  • sessions currently reconnecting or degraded: sum(pusher_sessions_degraded{job="backend-listen-metrics"})
  • reconnect circuit state and rejected attempts: pusher_circuit_breaker_state{job="backend-listen-metrics"} and sum(rate(pusher_circuit_breaker_rejections_total{job="backend-listen-metrics"}[5m]))
  • authenticated scrape target health: up{job=~"pusher-metrics|backend-listen-metrics"}

up == 1 proves only that Prometheus authenticated and scraped a target; it is not connection, drain, or recovery proof. A recovery aggregate can move only when a real client reconnects. If no real connection exists during the passive window, record reconnect/recovery as unproven—do not generate synthetic traffic to turn the signal non-zero.

4. Shared ConfigMap/Secret migration guard (required on key changes)

The 2026-07-22 production Pusher outage was a non-atomic cross-resource migration: the shared key REDIS_DB_HOST stopped materializing in its source while live pusher pods still referenced it. Pusher bulk-loads all of its ConfigMap keys via envFrom, so a key removed from that object left pods CreateContainerConfigError while /health stayed green — the fleet dropped to zero healthy pods with no probe signal. verify_shared_config_migration.py fails CLOSED before any mutation when a serving workload still references a ConfigMap/Secret source or key the proposed state removes or reclassifies.

  • Preflight (CI / pre-push, stdlib-only). python3 backend/scripts/verify_shared_config_migration.py preflight scans the pusher chart values and fails on a dual-source binding or a malformed valueFrom. Registered as shared-config-migration-preflight in .github/checks-manifest.yaml; it runs automatically. It has no inventory, so it cannot detect a key removed from a bulk-loaded object.

  • Guard mode (operator-invoked — the actual incident root-fix). Run this before any change that adds, removes, or moves a ConfigMap/Secret key consumed by pusher or any serving workload (Deployment/StatefulSet/DaemonSet/ Job/CronJob/ReplicaSet, incl. initContainers). It resolves every env.valueFrom, envFrom, and per-key reference against the proposed source inventory and fails closed on a removed/reclassified key. It reads object and key NAMES only — never ConfigMap/Secret values.

    # Render the proposed state (--rendered is repeatable across envs/workloads):
    helm template pusher backend/charts/pusher \
        -f backend/charts/pusher/prod_omi_pusher_values.yaml \
        --set-string image.digest=sha256:<64-lowercase-hex> \
        --set-string image.tag= \
        --set-string image.pullPolicy=IfNotPresent > /tmp/pusher-prod.yaml
    
    # Capture the CURRENT live key names in the guard's inventory format
    # ({configmaps: {<obj>: [key,...]}, secrets: {...}} — names only, never values):
    kubectl -n <env>-omi-backend get configmap <cfg> -o json \
        | jq '{configmaps: {(.metadata.name): (.data | keys)}}' > /tmp/live-keys.yaml
    
    # Write /tmp/proposed-keys.yaml in the same shape with the keys the object will
    # carry AFTER the change, then run the guard. --previous-inventory is what
    # catches a key removed from an envFrom bulk-loaded object (the outage class);
    # without it, envFrom removals are silent.
    python3 backend/scripts/verify_shared_config_migration.py guard \
        --rendered /tmp/pusher-prod.yaml \
        --source-inventory /tmp/proposed-keys.yaml \
        --previous-inventory /tmp/live-keys.yaml

    Non-zero exit = a serving workload still references a source/key the proposed state removes or reclassifies; do not apply. Needs PyYAML (the backend venv, or pip install pyyaml).

4. Deploy the immutable tag

Deploy the exact short-SHA image tag. Never deploy latest, and never let a chart-only deploy reset the workload to latest (per .github/AGENTS.md). The deploy workflow must wait for rollout completion with kubectl rollout status deploy/<env>-omi-pusher --timeout=... and fail on timeout.

5. Rollback

Roll back by re-running the Helm deploy against the prior immutable image tag (not latest). Because traffic/runtime rollback to N-1 is always safe by design (see N/N-1 compatibility checklist), this is the default rollback: point the chart at the previous tag and deploy it.

Production adoption is a separate, later decision. Do not treat prod rollback of this hardening as available until SCA-40 (digest chart support, chart-only/reuse-image deploy mode, and rollback evidence) has landed and a healthy pusher prod baseline is confirmed. See Relationship to SCA-40.


Rollout quality gates (fail-closed)

There are two fail-closed layers, and both must hold:

  1. Static/contract preflight (run before a deploy, see Operator runbook) — verify_pusher_rollout_gate.py preflight asserts the capacity, identity, probe-split, and metric-definition contract. It fails if a blocking metric is not even defined, because a rollout cannot be judged healthy against telemetry that does not exist. It does not scrape live values.
  2. Live rollout gate (watched during the deploy) — the blocking signals must be green and sufficiently populated. The rule that overrides everything else: missing telemetry = pause or fail, never green. A silent or unscrapable dashboard is a failed gate, not a passed one.

Blocking signals (real metric names emitted by pusher / backend-listen):

  • pusher_active_ws_connections — active pusher WebSocket sessions. The new pods must accept sessions and the count must recover to the pre-rollout baseline; a flatline means new pods are not accepting traffic.
  • backend_listen_active_ws_connections — backend-listen side of the path; a sustained drop with no recovery indicates listeners are failing to reconnect.
  • pusher_circuit_breaker_state (0 closed / 1 open / 2 half_open) and pusher_circuit_breaker_rejections_total — an opening breaker or rising rejections during a rollout means pusher is rejecting connections.
  • pusher_sessions_degraded — sessions backend-listen routed away from pusher. Sustained elevation (see backend/docs/runbooks/pusher-degraded.md) is a user-impact signal.
  • omi_journey_terminal_total{journey="pusher_session"} outcomes — terminal session outcomes; rising failure (close code 1011 / application failure) is a regression.
  • omi_journey_latency_seconds{journey="pusher_session"} — end-to-end session latency; a rollout must not push this outside its bounded threshold.
  • finalization health: listen_finalization_jobs, listen_finalization_retries_total, listen_finalization_dead_letter_total, and listen_finalization_oldest_nonterminal_age_seconds. A rollout that spikes retries, dead-letters, or oldest-nonterminal age is failing to drain cleanly.

The gate requires minimum capability/session counts plus bounded error and latency thresholds, not only elapsed time. Time-only gates are forbidden: a rollout that is merely "old enough" but has not served enough sessions, or is over its error/latency bounds, is not green.


N/N-1 compatibility checklist

Separate two kinds of rollback:

  • Traffic / runtime rollback to N-1 is always safe by design. Re-pointing the chart at the previous immutable tag and redeploying never requires a data migration to undo. This is the only rollback an operator should ever need to perform under pressure.
  • Irreversible data changes are a different category and must never be required by a rollout's rollback path. If a change is irreversible, the design obligation is to make N and N-1 coexist (additive, dual-read/dual-write, or feature-gated) so traffic can return to N-1 without a data rollback.

Full N-1 drain first is required before introducing any of the following incompatibilities (these are the changes that break a safe traffic rollback to N-1 and therefore cannot ride on a routine rolling update):

  • Envelope / key change: ENCRYPTION_SECRET or the per-user envelope derivation (HKDF-SHA256 in utils/encryption.py). N-1 cannot decrypt N-written segments.
  • GCS audio-chunk envelope: a change to how pusher batches/uploads audio chunks to GCS that N-1 cannot read back.
  • New ConversationStatus (or any persisted processing-state enum) that N-1 does not recognize and would mishandle.
  • Removed or renamed read fields on persisted models that released app-clients or N-1 services still read.
  • Redis key or TTL change that N-1 interprets differently (cache, rate-limit buckets, listen locks).
  • Finalization lease / fence protocol change: the durable conversation- finalization lease and fence protocol (the durable_job_required / claim / lease-epoch contract pusher enforces) — a change here can let an N-1 session double-process or bypass a durable claim.

If a change touches any of the above, it is not a candidate for this hardened rolling update without a documented N/N-1 coexistence plan and, where relevant, a full N-1 drain. Routine pushes (probe/drain/availability hardening, non-breaking additive fields) ride the rolling update and roll back to N-1 by re-pointing the chart.


Dev qualification plan

This hardening is qualified dev-first. Dev is the place to prove the choreography (readiness flip, app drain, NEG convergence, reconnect gap, finalization drain) end to end before any prod consideration.

How to qualify on dev (pusher dev: 1-3 pods, maxUnavailable: 0 / maxSurge: 1):

  1. Build once and render the digest exactly as in the Operator runbook. The automatic workflow records its digest only after the development rollout succeeds.
  2. Observe the passive bake. Use the dev Pusher dashboard's connection, readiness/drain, and reconnect-circuit panels. Do not manufacture traffic or infer product success only from readiness.
  3. Use the resulting attestation for a manual production request. Supply the exact digest and development qualification run ID; the production workflow validates the evidence, live ConfigMap references, exact digest render, and real next-wave capacity before Helm mutation.
  4. Record the evidence (commands, output, gate result) in the PR, per the root AGENTS.md Definition of Done.

Acknowledge the limit of dev qualification explicitly: dev proves the choreography, not prod-scale NEG/ILB behavior. Dev runs 1-3 pods with low WebSocket traffic, so it exercises the readiness/drain/reconnect sequence but does not prove prod-scale NEG propagation, the prod 40-pod / fourteen-wave rollout, or prod ILB connection draining. Those require the separate, later prod proof gated on SCA-40 and a healthy pusher prod baseline.


Follow-up deployment controls

SCA-115 completes the bounded follow-up to the native RollingUpdate hardening: digest identity is selected from a completed dev rollout, promotion preserves that exact manifest digest, and the production workflow gates the live cluster's next surge capacity before changing the Pusher release. The existing rollback contract remains a separate operator action; this workflow does not auto-roll back traffic or data.