forked from ChelseaKR/habitable
-
Notifications
You must be signed in to change notification settings - Fork 0
Expand file tree
/
Copy pathtest_critical_paths.py
More file actions
572 lines (475 loc) · 24.3 KB
/
Copy pathtest_critical_paths.py
File metadata and controls
572 lines (475 loc) · 24.3 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
# SPDX-License-Identifier: AGPL-3.0-or-later
# Copyright 2026 Chelsea Kelly-Reif
"""Edge-path tests for the evidence-integrity core (crypto, vault, tsa, verify).
These pin the rejection and failure branches of the four modules that carry the
per-module coverage floor (CODE-QUALITY-STANDARD: security/crypto-critical paths
hold >=95% branch coverage, above the 85% baseline). The floor is enforced by the
scoped ``coverage report --fail-under=95`` step in ``make cov`` (and therefore in
CI via ``make verify``).
"""
from __future__ import annotations
import base64
import json
import urllib.request
from datetime import UTC, datetime
from pathlib import Path
from typing import TYPE_CHECKING
import pytest
from asn1crypto import algos, cms, tsp
from cryptography import x509 as crypto_x509
from cryptography.hazmat.primitives import hashes as crypto_hashes
from cryptography.hazmat.primitives.asymmetric import ec, rsa
from cryptography.x509.oid import NameOID
from habitable.canonical import JSONValue, canonical_json, sha256_bytes
from habitable.crypto import (
Identity,
KdfParams,
PublicIdentity,
SymmetricKey,
create_keyfile,
open_keyfile,
open_sealed,
)
from habitable.errors import (
CryptoError,
FixityError,
TimestampError,
VaultError,
VerificationError,
)
from habitable.tsa import (
LocalRfc3161TSA,
Rfc3161HttpTSA,
TimestampToken,
verify_token,
)
from habitable.vault import Vault
from habitable.verify import verify_packet
if TYPE_CHECKING:
from collections.abc import Callable
DIGEST = sha256_bytes(b"the original photo bytes")
# --- crypto: every malformed input is a CryptoError, never a crash -------------
class TestCryptoRejections:
def test_unsupported_kdf_rejected(self) -> None:
raw: dict[str, object] = {"name": "argon2"}
with pytest.raises(CryptoError, match="unsupported KDF"):
KdfParams.from_dict(raw)
def test_symmetric_key_length_enforced(self) -> None:
with pytest.raises(CryptoError, match="32 bytes"):
SymmetricKey(b"short")
def test_ciphertext_shorter_than_a_nonce_rejected(self) -> None:
with pytest.raises(CryptoError, match="too short"):
SymmetricKey.generate().decrypt(b"tiny")
def test_public_identity_must_be_64_bytes(self) -> None:
encoded = base64.b64encode(b"way-too-short").decode("ascii")
with pytest.raises(CryptoError, match="64 bytes"):
PublicIdentity.decode(encoded)
def test_public_identity_rejects_bad_base64(self) -> None:
with pytest.raises(CryptoError, match="base64"):
PublicIdentity.decode("!!! not base64 !!!")
def test_identity_deserialize_must_be_64_bytes(self) -> None:
with pytest.raises(CryptoError, match="64 bytes"):
Identity.deserialize(b"short")
def test_sealed_box_too_short(self) -> None:
with pytest.raises(CryptoError, match="too short"):
open_sealed(Identity.generate(), b"tiny")
class TestKeyfileRejections:
def test_keyfile_must_be_json(self) -> None:
with pytest.raises(CryptoError, match="not valid JSON"):
open_keyfile("definitely not json", "pw")
def test_keyfile_must_be_an_object(self) -> None:
with pytest.raises(CryptoError, match="JSON object"):
open_keyfile("[]", "pw")
@staticmethod
def _tampered(mutate: Callable[[dict[str, object]], None]) -> str:
keyfile, _ = create_keyfile("pw")
doc: dict[str, object] = json.loads(keyfile)
mutate(doc)
return json.dumps(doc)
def test_unknown_version_rejected(self) -> None:
tampered = self._tampered(lambda d: d.__setitem__("habitable_keyfile_version", 99))
with pytest.raises(CryptoError, match="unsupported keyfile version"):
open_keyfile(tampered, "pw")
def test_kdf_must_be_an_object(self) -> None:
tampered = self._tampered(lambda d: d.__setitem__("kdf", "scrypt"))
with pytest.raises(CryptoError, match="expected object"):
open_keyfile(tampered, "pw")
def test_kdf_salt_must_be_a_string(self) -> None:
def mutate(doc: dict[str, object]) -> None:
kdf = doc["kdf"]
assert isinstance(kdf, dict)
kdf["salt"] = 12345
with pytest.raises(CryptoError, match="expected string"):
open_keyfile(self._tampered(mutate), "pw")
def test_kdf_cost_must_be_an_integer(self) -> None:
def mutate(doc: dict[str, object]) -> None:
kdf = doc["kdf"]
assert isinstance(kdf, dict)
kdf["n"] = "expensive"
with pytest.raises(CryptoError, match="expected integer"):
open_keyfile(self._tampered(mutate), "pw")
# --- vault: fixity failures and corrupt records surface as errors --------------
class TestVaultCriticalPaths:
def test_seal_original_detects_source_change(
self, make_vault: Callable[..., Vault], tmp_path: Path
) -> None:
vault = make_vault("v-seal")
source = tmp_path / "original.bin"
source.write_bytes(b"actual bytes")
with pytest.raises(FixityError, match="changed during capture"):
vault.seal_original("cap-1", source, sha256_bytes(b"promised bytes"))
def test_store_original_bytes_checks_hash(self, make_vault: Callable[..., Vault]) -> None:
vault = make_vault("v-store")
with pytest.raises(FixityError, match="do not match"):
vault.store_original_bytes("cap-1", b"data", sha256_bytes(b"other"))
def test_read_original_missing_is_an_error(self, make_vault: Callable[..., Vault]) -> None:
vault = make_vault("v-missing")
with pytest.raises(VaultError, match="missing"):
vault.read_original("cap-none", sha256_bytes(b"data"))
def test_read_original_reverifies_fixity(self, make_vault: Callable[..., Vault]) -> None:
vault = make_vault("v-fixity")
content_hash = sha256_bytes(b"data")
name = vault.store_original_bytes("cap-1", b"data", content_hash)
# A validly-encrypted substitution under the same AAD must still fail the
# fixity re-check on read: decryption alone is not proof of integrity.
aad = f"original:cap-1:{content_hash}".encode()
(vault.path / "originals" / name).write_bytes(vault._dek.encrypt(b"swapped", aad=aad))
with pytest.raises(FixityError, match="failed fixity"):
vault.read_original("cap-1", content_hash)
def test_get_token_absent_returns_none(self, make_vault: Callable[..., Vault]) -> None:
assert make_vault("v-token").get_token("cap-none") is None
def test_corrupt_token_records_raise(self, make_vault: Callable[..., Vault]) -> None:
vault = make_vault("v-corrupt")
token = TimestampToken(kind="dev", tsa_name="t", data=b"{}")
(vault.path / "tokens" / "cap-1.json").write_text("[]", encoding="utf-8")
with pytest.raises(VaultError, match="corrupt token record"):
vault.get_token("cap-1")
for stem in ("cap-2.additional", "cap-3.archive"):
(vault.path / "tokens" / f"{stem}.json").write_text("{}", encoding="utf-8")
with pytest.raises(VaultError, match="corrupt additional-token record"):
vault.add_additional_token("cap-2", token)
with pytest.raises(VaultError, match="corrupt additional-token record"):
vault.get_additional_tokens("cap-2")
with pytest.raises(VaultError, match="corrupt archive-token record"):
vault.add_archive_token("cap-3", token)
with pytest.raises(VaultError, match="corrupt archive-token record"):
vault.get_archive_tokens("cap-3")
def test_open_with_missing_blob_raises(
self, make_vault: Callable[..., Vault], tmp_path: Path
) -> None:
vault = make_vault("v-blob")
(vault.path / "identity.enc").unlink()
with pytest.raises(VaultError, match="vault file missing"):
Vault.open(vault.path, "test-passphrase")
def test_open_with_corrupt_case_state_raises(self, make_vault: Callable[..., Vault]) -> None:
vault = make_vault("v-case")
vault._write_blob("case.enc", canonical_json([]))
with pytest.raises(VaultError, match="corrupt case state"):
Vault.open(vault.path, "test-passphrase")
def test_open_with_corrupt_custody_raises(self, make_vault: Callable[..., Vault]) -> None:
vault = make_vault("v-custody")
vault._write_blob("custody.enc", canonical_json({"not": "a list"}))
with pytest.raises(VaultError, match="expected a JSON array"):
Vault.open(vault.path, "test-passphrase")
vault._write_blob("custody.enc", canonical_json([1, 2]))
with pytest.raises(VaultError, match="expected a JSON object record"):
Vault.open(vault.path, "test-passphrase")
# --- tsa: malformed tokens, HTTP client, and chain-of-trust edges ---------------
class TestDevTokenRejections:
def test_token_record_must_be_well_formed(self) -> None:
with pytest.raises(TimestampError, match="malformed timestamp token record"):
TimestampToken.from_dict({})
def test_dev_token_must_be_json(self) -> None:
with pytest.raises(TimestampError, match="not valid JSON"):
verify_token(TimestampToken("dev", "t", b"not json"), DIGEST)
def test_dev_token_must_be_an_object(self) -> None:
with pytest.raises(TimestampError, match="must be an object"):
verify_token(TimestampToken("dev", "t", canonical_json([])), DIGEST)
def test_dev_token_missing_signature(self) -> None:
with pytest.raises(TimestampError, match="missing signature"):
verify_token(TimestampToken("dev", "t", canonical_json({})), DIGEST)
def test_dev_token_missing_pubkey(self) -> None:
doc: dict[str, JSONValue] = {"sig": base64.b64encode(b"x").decode("ascii")}
with pytest.raises(TimestampError, match="missing pubkey"):
verify_token(TimestampToken("dev", "t", canonical_json(doc)), DIGEST)
def test_dev_token_missing_gen_time(self) -> None:
# A validly-signed dev token with no gen_time is still rejected.
identity = Identity.generate()
pub = base64.b64encode(identity.public().sign_public).decode("ascii")
payload: dict[str, JSONValue] = {
"kind": "dev",
"tsa_name": "t",
"digest": DIGEST,
"alg": "ed25519",
"pubkey": pub,
}
signature = identity.sign(canonical_json(payload))
doc: dict[str, JSONValue] = {
**payload,
"sig": base64.b64encode(signature).decode("ascii"),
}
with pytest.raises(TimestampError, match="missing gen_time"):
verify_token(TimestampToken("dev", "t", canonical_json(doc)), DIGEST)
class _FakeHttpResponse:
"""Minimal stand-in for the urlopen context manager."""
def __init__(self, body: bytes) -> None:
self._body = body
def read(self) -> bytes:
return self._body
def __enter__(self) -> _FakeHttpResponse:
return self
def __exit__(self, *exc_info: object) -> None:
return None
def _serve(monkeypatch: pytest.MonkeyPatch, body: bytes) -> None:
def fake_urlopen(request: urllib.request.Request, timeout: float = 0.0) -> _FakeHttpResponse:
assert request.get_header("Content-type") == "application/timestamp-query"
return _FakeHttpResponse(body)
monkeypatch.setattr(urllib.request, "urlopen", fake_urlopen)
class TestHttpTSA:
def test_round_trip_against_a_granted_response(
self, monkeypatch: pytest.MonkeyPatch, local_tsa: LocalRfc3161TSA
) -> None:
real = local_tsa.stamp(DIGEST)
response = tsp.TimeStampResp(
{
"status": tsp.PKIStatusInfo({"status": 0}),
"time_stamp_token": cms.ContentInfo.load(real.data),
}
)
_serve(monkeypatch, bytes(response.dump()))
token = Rfc3161HttpTSA("fake-tsa", "https://tsa.example/stamp").stamp(DIGEST)
info = verify_token(token, DIGEST, trusted_certs=[local_tsa.certificate])
assert info.kind == "rfc3161"
assert info.trusted_chain is True
def test_non_http_url_refused(self) -> None:
client = Rfc3161HttpTSA("bad", "file:///etc/passwd")
with pytest.raises(TimestampError, match="non-HTTP"):
client.stamp(DIGEST)
def test_network_failure_is_a_timestamp_error(self, monkeypatch: pytest.MonkeyPatch) -> None:
def explode(request: urllib.request.Request, timeout: float = 0.0) -> None:
raise OSError("connection refused")
monkeypatch.setattr(urllib.request, "urlopen", explode)
client = Rfc3161HttpTSA("down", "https://tsa.example/stamp")
with pytest.raises(TimestampError, match="failed"):
client.stamp(DIGEST)
def test_rejected_status_is_surfaced(
self, monkeypatch: pytest.MonkeyPatch, local_tsa: LocalRfc3161TSA
) -> None:
# Even if a rejection carries a (stray) token, the status must win.
response = tsp.TimeStampResp(
{
"status": tsp.PKIStatusInfo({"status": 2}),
"time_stamp_token": cms.ContentInfo.load(local_tsa.stamp(DIGEST).data),
}
)
_serve(monkeypatch, bytes(response.dump()))
client = Rfc3161HttpTSA("rejecting", "https://tsa.example/stamp")
with pytest.raises(TimestampError, match="rejected"):
client.stamp(DIGEST)
def test_garbage_response_is_a_parse_error(self, monkeypatch: pytest.MonkeyPatch) -> None:
_serve(monkeypatch, b"this is not ASN.1")
client = Rfc3161HttpTSA("garbled", "https://tsa.example/stamp")
with pytest.raises(TimestampError, match="could not parse"):
client.stamp(DIGEST)
def _forge(token: TimestampToken, content_info: object) -> TimestampToken:
der = bytes(content_info.dump(force=True)) # type: ignore[attr-defined]
return TimestampToken(kind="rfc3161", tsa_name=token.tsa_name, data=der)
class TestRfc3161Tampering:
def test_not_cms_signed_data(self) -> None:
plain = cms.ContentInfo({"content_type": "data", "content": b"hello"})
token = TimestampToken("rfc3161", "t", bytes(plain.dump()))
with pytest.raises(TimestampError, match="not CMS SignedData"):
verify_token(token, DIGEST)
def test_wrong_encapsulated_content(self, local_tsa: LocalRfc3161TSA) -> None:
token = local_tsa.stamp(DIGEST)
content_info = cms.ContentInfo.load(token.data)
content_info["content"]["encap_content_info"] = cms.EncapsulatedContentInfo(
{"content_type": "data", "content": cms.ParsableOctetString(b"x")}
)
with pytest.raises(TimestampError, match="does not encapsulate TSTInfo"):
verify_token(_forge(token, content_info), DIGEST)
def test_imprint_must_be_sha256(self, local_tsa: LocalRfc3161TSA) -> None:
token = local_tsa.stamp(DIGEST)
content_info = cms.ContentInfo.load(token.data)
signed = content_info["content"]
tst = tsp.TSTInfo.load(bytes(signed["encap_content_info"]["content"].contents))
tst["message_imprint"]["hash_algorithm"] = algos.DigestAlgorithm({"algorithm": "sha1"})
signed["encap_content_info"]["content"] = tst
with pytest.raises(TimestampError, match="not SHA-256"):
verify_token(_forge(token, content_info), DIGEST)
def test_signer_certificate_must_be_present(self, local_tsa: LocalRfc3161TSA) -> None:
token = local_tsa.stamp(DIGEST)
content_info = cms.ContentInfo.load(token.data)
signer = content_info["content"]["signer_infos"][0]
# Point the signer identifier at a serial the embedded certs don't carry.
signer["sid"].chosen["serial_number"] = 424242
with pytest.raises(TimestampError, match="signing certificate"):
verify_token(_forge(token, content_info), DIGEST)
def test_signed_attributes_are_required(self, local_tsa: LocalRfc3161TSA) -> None:
token = local_tsa.stamp(DIGEST)
content_info = cms.ContentInfo.load(token.data)
signer = content_info["content"]["signer_infos"][0]
signer["signed_attrs"] = cms.CMSAttributes([])
with pytest.raises(TimestampError, match="no signed attributes"):
verify_token(_forge(token, content_info), DIGEST)
def test_unsupported_message_digest_algorithm(self, local_tsa: LocalRfc3161TSA) -> None:
token = local_tsa.stamp(DIGEST)
content_info = cms.ContentInfo.load(token.data)
signer = content_info["content"]["signer_infos"][0]
signer["digest_algorithm"] = algos.DigestAlgorithm({"algorithm": "md5"})
with pytest.raises(TimestampError, match="unsupported digest algorithm"):
verify_token(_forge(token, content_info), DIGEST)
def test_signature_hash_falls_back_to_digest_algorithm(
self, local_tsa: LocalRfc3161TSA
) -> None:
# md5_rsa advertises an unsupported hash; verification must fall back to
# the signer's digest algorithm (SHA-256) and still validate the token.
token = local_tsa.stamp(DIGEST)
content_info = cms.ContentInfo.load(token.data)
signer = content_info["content"]["signer_infos"][0]
signer["signature_algorithm"] = algos.SignedDigestAlgorithm({"algorithm": "md5_rsa"})
info = verify_token(_forge(token, content_info), DIGEST)
assert info.kind == "rfc3161"
def test_unsupported_signature_algorithm(self, local_tsa: LocalRfc3161TSA) -> None:
token = local_tsa.stamp(DIGEST)
content_info = cms.ContentInfo.load(token.data)
signer = content_info["content"]["signer_infos"][0]
# ECDSA algorithm identifier over an RSA key: no valid verification path.
signer["signature_algorithm"] = algos.SignedDigestAlgorithm({"algorithm": "sha256_ecdsa"})
with pytest.raises(TimestampError, match="unsupported signature algorithm"):
verify_token(_forge(token, content_info), DIGEST)
def test_tampered_signature_bytes_rejected(self, local_tsa: LocalRfc3161TSA) -> None:
token = local_tsa.stamp(DIGEST)
content_info = cms.ContentInfo.load(token.data)
signer = content_info["content"]["signer_infos"][0]
signer["signature"] = b"\x00" * 256
with pytest.raises(TimestampError, match="signature is invalid"):
verify_token(_forge(token, content_info), DIGEST)
def _self_signed(
common_name: str, key: rsa.RSAPrivateKey | ec.EllipticCurvePrivateKey
) -> crypto_x509.Certificate:
name = crypto_x509.Name([crypto_x509.NameAttribute(NameOID.COMMON_NAME, common_name)])
now = datetime.now(tz=UTC)
return (
crypto_x509.CertificateBuilder()
.subject_name(name)
.issuer_name(name)
.public_key(key.public_key())
.serial_number(crypto_x509.random_serial_number())
.not_valid_before(now.replace(year=now.year - 1))
.not_valid_after(now.replace(year=now.year + 5))
.sign(key, crypto_hashes.SHA256())
)
class TestCertificateChain:
def test_issuer_signed_chain_is_trusted(self) -> None:
from habitable.tsa import _issue_token
ca_key = rsa.generate_private_key(public_exponent=65537, key_size=2048)
ca_cert = _self_signed("test-root", ca_key)
leaf_key = rsa.generate_private_key(public_exponent=65537, key_size=2048)
now = datetime.now(tz=UTC)
leaf_cert = (
crypto_x509.CertificateBuilder()
.subject_name(
crypto_x509.Name([crypto_x509.NameAttribute(NameOID.COMMON_NAME, "leaf-tsa")])
)
.issuer_name(ca_cert.subject)
.public_key(leaf_key.public_key())
.serial_number(crypto_x509.random_serial_number())
.not_valid_before(now.replace(year=now.year - 1))
.not_valid_after(now.replace(year=now.year + 5))
.sign(ca_key, crypto_hashes.SHA256())
)
der = _issue_token(DIGEST, private_key=leaf_key, certificate=leaf_cert, gen_time=now)
token = TimestampToken(kind="rfc3161", tsa_name="leaf-tsa", data=der)
# Trusting the issuing CA (not the leaf itself) chains the token.
assert verify_token(token, DIGEST, trusted_certs=[ca_cert]).trusted_chain is True
# An unrelated RSA root does not vouch for the leaf.
other_key = rsa.generate_private_key(public_exponent=65537, key_size=2048)
other_cert = _self_signed("unrelated-root", other_key)
assert verify_token(token, DIGEST, trusted_certs=[other_cert]).trusted_chain is False
# A non-RSA trusted certificate can never RSA-vouch for this leaf.
ec_cert = _self_signed("ec-root", ec.generate_private_key(ec.SECP256R1()))
assert verify_token(token, DIGEST, trusted_certs=[ec_cert]).trusted_chain is False
# --- verify: hostile packet inputs are clean rejections, never crashes ---------
class TestPacketRejections:
def test_missing_bundle_is_an_error(self, tmp_path: Path) -> None:
with pytest.raises(VerificationError, match=r"no bundle\.json"):
verify_packet(tmp_path)
def test_bundle_must_be_valid_json(self, tmp_path: Path) -> None:
(tmp_path / "bundle.json").write_bytes(b"{nope")
with pytest.raises(VerificationError, match="not valid JSON"):
verify_packet(tmp_path)
def test_bundle_must_be_an_object(self, tmp_path: Path) -> None:
(tmp_path / "bundle.json").write_text("[]", encoding="utf-8")
with pytest.raises(VerificationError, match="JSON object"):
verify_packet(tmp_path)
@staticmethod
def _write_bundle(packet_dir: Path, bundle: dict[str, JSONValue]) -> bytes:
raw = json.dumps(bundle).encode("utf-8")
(packet_dir / "bundle.json").write_bytes(raw)
return raw
def test_malformed_items_and_missing_signature(self, tmp_path: Path) -> None:
self._write_bundle(
tmp_path,
{
"packet_version": 1,
"custody_proof": {"entries": [], "head_hash": ""},
"items": [
123, # not an object: recorded as a problem, not a crash
{
"capture_id": "cap-1",
"content_hash": DIGEST,
# a non-object additional timestamp is skipped
"additional_timestamps": [5],
},
],
},
)
report = verify_packet(tmp_path)
assert "malformed item in bundle" in report.problems
assert report.signature_ok is False # no bundle.sig.json at all
assert report.ok is False
[verdict] = report.items
assert verdict.timestamp_verified is False
assert "awaiting timestamp" in verdict.notes
def test_signature_file_edge_cases(self, tmp_path: Path) -> None:
bundle_bytes = self._write_bundle(
tmp_path,
{"packet_version": 1, "custody_proof": {"entries": [], "head_hash": ""}, "items": []},
)
sig_path = tmp_path / "bundle.sig.json"
sig_path.write_text("{invalid", encoding="utf-8")
assert verify_packet(tmp_path).signature_ok is False
sig_path.write_text("[]", encoding="utf-8")
assert verify_packet(tmp_path).signature_ok is False
doc: dict[str, JSONValue] = {
"bundle_sha256": sha256_bytes(bundle_bytes),
"sign_public": 42, # wrong type: rejected before any signature math
"signature": "AA==",
}
sig_path.write_text(json.dumps(doc), encoding="utf-8")
assert verify_packet(tmp_path).signature_ok is False
def test_trusted_additional_timestamp_counts(
self, tmp_path: Path, local_tsa: LocalRfc3161TSA
) -> None:
extra = local_tsa.stamp(DIGEST)
extra_record: dict[str, JSONValue] = dict(extra.to_dict())
self._write_bundle(
tmp_path,
{
"packet_version": 1,
"custody_proof": {"entries": [], "head_hash": ""},
"items": [
{
"capture_id": "cap-1",
"content_hash": DIGEST,
"additional_timestamps": [extra_record],
}
],
},
)
report = verify_packet(tmp_path, trusted_certs=[local_tsa.certificate])
[verdict] = report.items
assert verdict.timestamp_verified is True
assert verdict.tsa_name == local_tsa.name
assert verdict.verified_authorities == (local_tsa.name,)