Skip to content

Latest commit

 

History

History
25 lines (19 loc) · 883 Bytes

File metadata and controls

25 lines (19 loc) · 883 Bytes

MisakaNet Long-Term Roadmap (Architecture)

These are long-term architectural goals tracked for reference. They are NOT open bounty issues. Work on them requires maintainer coordination.

2026-08-31: removed federation/Hub/sidecar/DALN items — the project is a failure-lesson network, not a decentralized architecture. Hub was retired the same day.

Status: Planning / Future

Trust & Quality

  • #321 Distributed trust system with verification tiers
  • #322 Reputation system with reuse signals
  • #324 Governance config — misaka-protocol.json

Quality & Versioning

  • #327 Semantic versioning for lessons and protocol
  • #328 Anti-gaming safeguards for reputation system

When to activate

These become active when:

  1. Core platform (search, MCP, intake) is stable
  2. There are enough real contributors to benefit from trust/reputation